McToots
01-28-2006, 06:15 PM
All you N-er's, note the critical work items:
1) Finishing the bridge, switch, and track remodeling project. This will include soldering in some track power drops to get mains 1 and 2 up and running. We also will need to cut in some track gaps on the new crossover. Can't have any short circuits.:mad:
2) Set up the reversing loop on the peninsula.
3) Hopefully test run trains on all mains.:D
For those that are not comfortable with some of the construction activities, #3 main will be available for running your trains!:) Hope to see you all tomorrow!
1) Finishing the bridge, switch, and track remodeling project. This will include soldering in some track power drops to get mains 1 and 2 up and running. We also will need to cut in some track gaps on the new crossover. Can't have any short circuits.:mad:
2) Set up the reversing loop on the peninsula.
3) Hopefully test run trains on all mains.:D
For those that are not comfortable with some of the construction activities, #3 main will be available for running your trains!:) Hope to see you all tomorrow!