View Single Post
  #1  
Old 09-10-2008, 07:20 PM
Phil Brooks's Avatar
Phil Brooks Phil Brooks is offline
Senior Member
 
Join Date: Aug 2005
Posts: 101
New Show Layout Track Plan

All KAMR Members-

For some time there has been discussion at KAMR about the need for a small, portable "show layout" to represent us at train shows and other outside functions. Since the layout will be small, we decided N-Scale would pack in the most layout in the required small-radius curves. For several weeks, some of us have been planning and working out the design and logistics of such a layout.

The design criteria are-

1. Portable and lightweight
2. As few parts to haul and assemble as possible
3. Setup, manning, tear down, and transport by as few as two people
4. Must fit in a van or MUV
5. High-quality to bring visitors to KAMR
6. DCC operation
7. Setup without complex tools

Because this is an "ambassador" for CMOR and KAMR, it has been brought up that the funds for the layout will come from the general fund, not the divisions. When finished, it will be available to all club members for any function they feel suitable.

We will have a vote from the general membership at the next business meeting to proceed with the layout or not.

Below is a plan of the proposed layout for comments/questions. It is 32"x136", but will break down and fasten together to make a 32" x 68" x 24" box with legs folded into the frame. All scenery is enclosed by the backdrop and ends when packed.

Because the KAMR website is a public space, a separate e-mail will be circulated with a cost estimate for all current KAMR members.

Please send any comments/suggestions to Phil Brooks, Bruce McElhoe, or Larry Burkholder, or feel free to reply to this post.

Thanks!

-Phil
Attached Images
 
__________________
Model Railroading means..."A Money-Pit filled with Trains"
Reply With Quote